  • Kentucky Eminent Domain: What a Commercial Buyer Checks

    Corridor Notes · Due Diligence

    Kentucky eminent domain reaches commercial property through a short, rigid statutory sequence, and the number a commercial buyer should care about is not the value of the strip taken — it is the drop in value of everything that is left. The Eminent Domain Act of Kentucky, KRS 416.540 to 416.670, sets that measure, names the people who make the first award, and gives the landowner a repurchase right most buyers have never heard of.

    How does Kentucky measure what a partial taking is worth?

    By the difference between the whole property’s market value immediately before the taking and the remainder’s market value immediately after it — not by the acreage taken.

    That rule sits in KRS 416.580, which directs the commissioners to award “such a sum as will fairly represent the reduction in the market value of the entire property,” defined in the statute as the difference between the before value and the after value of the remainder, plus the fair rental value of any temporary easements. On a commercial parcel that distinction is the whole argument. Twelve feet off the front of a retail lot may be worth very little as dirt and a great deal as the twelve feet that held the required parking row, the drive aisle, or the sight distance at the entrance.

    Two companion items on this site are worth reading alongside it, because they are usually where the “after” damage actually shows up: Lexington’s commercial parking requirements and the commercial entrance permit on a Kentucky state route.

    Who sets the first number, and are they appraisers?

    No. Kentucky’s first award comes from three commissioners the Circuit Court appoints — described in the statute as impartial housekeepers of the county who own land.

    KRS 416.580 requires the Circuit Court — or the Circuit Court Clerk if the judge is out of the county — to appoint three impartial housekeepers of the county who are owners of land, sworn to discharge the duty faithfully. They view the property and return a written report within fifteen days of appointment. They are not required by that section to be certified appraisers. A commercial owner who treats the commissioners’ report as a professional appraisal, rather than as a first number that can be excepted to, has misread the statute.

    The commissioners’ award is an opening figure produced by three landowning neighbours in fifteen days. It is not a valuation conclusion, and the statute never calls it one.

    What happens after the commissioners file their report?

    The court reviews the report for statutory form, and if the owner files nothing contesting the right to condemn, it enters an interlocutory judgment letting the condemnor take possession on payment.

    KRS 416.610 gives the sequence: after the owner has been summoned twenty days, the court examines the commissioners’ report against KRS 416.580 and orders corrections if the form is wrong. With no answer putting the right to condemn in issue, the court enters an interlocutory judgment finding the petitioner has the right to condemn, authorising possession upon payment of the commissioners’ award to the owner or to the clerk, and providing for conveyance of title if no exception is taken. Possession, in other words, can move well before anyone has agreed on the price. “Court” throughout the Act means the Circuit Court, per the definitions in KRS 416.540 — the trial court of general jurisdiction described by the Kentucky Court of Justice.

    Can land taken by condemnation ever come back?

    Yes. If the condemnor does not start development within eight years, Kentucky gives the current landowner the right to repurchase at the price the condemnor originally paid.

    This is the provision almost nobody raises at closing. KRS 416.670 requires development to begin within eight years of the deed to the condemnor or the date it took possession, whichever is earlier, for the purpose for which the property was condemned. Failure entitles the current landowner to repurchase at the price the condemnor paid. The condemnor that fails to develop — or, on a highway project under KRS Chapter 177, fails to begin design — within eight years must notify the current landowner of that right, and if the landowner declines, the property is publicly noticed under KRS Chapter 424 within thirty days and sold at auction. The section carves out property acquired for industrial development under KRS Chapter 152 and transportation improvement district projects under KRS 184.350 to 184.395.

    The practical consequence for a commercial buyer: “the state took the front of this lot years ago” is not the end of the inquiry. The date of the deed or of possession, and whether anything was ever built, are both knowable facts.

    Which body actually files the petition in Lexington?

    Not the department that wants the land. Under KRS 416.560 a city, county or urban-county agency with condemnation power must ask its own governing body to institute the proceeding on its behalf.

    KRS 416.560 provides that a department, instrumentality or agency of a consolidated local government, city, county or urban-county government holding a right of eminent domain under other statutes shall exercise it only by requesting the governing body to institute condemnation proceedings under KRS 416.570, with all costs borne by the requesting agency. Where an agency operates across more than one governmental unit, it requests the governing body of the unit containing the largest part of the tract. The practical reading for Fayette County: the paper trail for a contemplated taking runs through the urban-county governing body’s agenda, not only through the agency that wants the ground.

    What this changes in a commercial due-diligence file

    Having worked this kind of file, the professional habit that matters is sequencing, not cleverness. Condemnation questions are cheap to ask early and expensive to discover late, because the statute moves possession on an interlocutory judgment and leaves the price argument for afterwards. Ask what is already of record, read the whole chapter rather than the one section someone quoted at you, and treat the commissioners’ figure as the beginning of a negotiation the statute explicitly contemplates — not as a verdict. Nothing here is legal advice; condemnation is a Circuit Court proceeding and an owner facing one should have Kentucky counsel.

    StageStatuteWhat governs it
    Who may file, and through whomKRS 416.540, 416.560Definitions; local agencies file through their governing body
    First awardKRS 416.580Three commissioners; before-and-after measure; report in 15 days
    PossessionKRS 416.610Interlocutory judgment after 20 days’ summons; possession on payment
    If nothing gets builtKRS 416.670Eight-year development deadline; landowner repurchase right
    Does Kentucky’s before-and-after rule apply when the whole parcel is taken?

    KRS 416.580 states the measure as the difference between the market value of the entire property immediately before the taking and the market value of the remainder immediately after. Where nothing remains, there is no remainder value to subtract. The statutory text also adds the fair rental value of any temporary easements sought to be condemned.

    How long does the owner have before the court can act?

    KRS 416.610 says the court acts after the owner has been summoned twenty days. The commissioners separately must return their written report within fifteen days of their appointment under KRS 416.580.

    Who counts as a “condemnor” under the Act?

    KRS 416.540 defines condemnor broadly: any person, corporation or entity — including the Commonwealth, its agencies and departments, a county, a municipality or a taxing district — authorised and empowered by law to exercise the right of eminent domain. The same section defines eminent domain to include private persons, corporations or business entities acting under authority of law.

    Last updated: October 18, 2026. Statutory text read from the Kentucky Legislative Research Commission’s published statutes on October 18, 2026.

    By Marcos Gil, REALTOR® — Keller Williams Commonwealth · KY Real Estate License No. 296259 · Call or text (859) 310-1209.

  • Lexington Occupational License Fee: 2.25% on Net Profits

    Corridor Notes · Occupancy Costs

    The Lexington occupational license fee is 2.25%, and it applies to net profits earned in Fayette County — which means it is a cost of operating in the commercial space you are about to buy or lease, not a line item your broker’s pro forma usually carries. It belongs in your diligence file next to the rent, the CAM estimate and the property tax bill.

    Does Lexington charge an occupational license fee on business net profits?

    Yes. The Lexington-Fayette Urban County Government assesses a 2.25% occupational license fee on individual compensation and on net profits, and businesses file it with its Division of Revenue.

    That single sentence is published by the government that collects it, and it is worth reading twice, because the two halves do different work. The compensation half is a payroll matter your bookkeeper already knows about. The net profits half is the one that changes how a commercial deal pencils: if the business occupying the building earns profit attributable to Fayette County, the fee attaches to that profit. Buying a building in Scott County and one in Fayette County are therefore not the same operating decision, even at identical price per square foot.

    The detail I want to flag for buyers is that this is a license fee, not a property tax. It does not show up on the PVA record you pulled, it does not appear in the seller’s tax bill you asked for, and it will not surface in a title search. Nothing in the standard commercial diligence packet goes looking for it. You have to go looking for it on purpose — see the commercial due diligence checklist for where it sits relative to the rest of the file.

    Who deals with the net profits return — the landlord or the tenant?

    The fee follows the business earning the profit, not the deed. An owner-occupier carries it themselves; a landlord and a tenant each handle their own.

    This is the distinction that most often gets muddled in conversation, so it is worth being plain about it. A landlord who collects rent in Fayette County has net profits of their own to account for. A tenant operating a business in the same building has net profits of their own. Neither one is filing on behalf of the other, and neither one’s obligation disappears because the other one exists. When an owner-occupier buys a building, both roles land on the same entity, which is usually when the question gets asked for the first time — at closing, which is late.

    If you are weighing ownership against a lease, this is one of the inputs that genuinely differs between the two structures rather than just moving money around. The lease versus buy comparison for Lexington commercial space is the right place to put it.

    A county line in Central Kentucky is not a formality. It is an operating cost difference that follows your profit, and it never appears on the PVA card.

    What changed for net profits filing in March 2026?

    Filing moved online. On March 4, 2026, LFUCG opened a digital net profits system accepting extensions, estimated payments and annual returns, which previously had to be mailed with a check.

    The government’s own announcement is dated Wednesday, March 4, 2026, and describes the change in those terms: all net profit forms — extensions, estimated payments and annual returns — can now be submitted through the new system, where previously filings could only be submitted by mailing the forms and a check. The current forms and the online portal both live with the Lexington-Fayette Urban County Government Division of Revenue, which lists its office at 218 E. Main St. and publishes the 2.25% rate on the same page.

    Why a filing-mechanics change matters to a real estate decision: it is a reliable signal of which obligations a jurisdiction is actively administering. A fee that just got a new digital filing system in 2026 is not a dormant line in an old ordinance. Plan for it.

    Where the fee belongs in a commercial deal analysis

    Put it with the operating assumptions, not the closing costs. It recurs annually against profit, so it behaves like an operating expense rather than a one-time transaction cost.

    After enough of these, the pattern I have learned to watch for is not the big obvious number — everyone checks the rent and the tax bill. It is the obligation that lives in a different department from the one you are already talking to. Zoning sits with Planning, the assessment sits with the PVA, and the license fee sits with Revenue. A buyer who has called two of those three and feels thorough is the buyer who gets surprised. The habit worth building is to ask, for every jurisdiction you are considering, which separate office collects something from an operating business there — and then to call that office rather than infer the answer.

    One boundary on all of this: I am a real estate agent, not your CPA and not your tax adviser. I can tell you the fee exists, what the government publishes about it, and where it belongs in your analysis. What it does to your specific entity’s return is a question for the Division of Revenue or your accountant, and it is worth the phone call before you are under contract rather than after. The same goes if your use is unusual — short-term rentals, for one, are required to obtain a separate special fees license according to the same Revenue page.

    Is the occupational license fee the same thing as Fayette County property tax?

    No. Property tax is assessed against the real estate and appears on the PVA record and the tax bill. The occupational license fee is assessed on compensation and net profits and is collected by the LFUCG Division of Revenue. A diligence file can contain a complete property tax picture and say nothing at all about the license fee.

    Does the fee change if I buy in Jessamine, Scott or Madison County instead?

    The 2.25% figure published by LFUCG is Fayette County’s. Other Central Kentucky jurisdictions set their own occupational or net profits rates, and some set none. Because the rates are set and changed locally, the only reliable way to compare two submarkets is to confirm the current figure with each jurisdiction directly rather than carry a number across a county line.

    I am leasing, not buying. Do I still need to care about this?

    Yes, if your business will earn profit attributable to Fayette County. The obligation follows the business, not the ownership of the building. A tenant’s exposure does not pass to the landlord because the landlord owns the real estate.

    Last updated October 17, 2026.

    By Marcos Gil, REALTOR® — Keller Williams Commonwealth · KY Real Estate License No. 296259 · Call or text (859) 310-1209.

  • Unacknowledged Deed in Kentucky: Still Constructive Notice

    Corridor Notes · Title & Recording

    An unacknowledged deed in Kentucky — recorded, but never notarized or proved the way the statute requires — used to be a hole in the chain of title. Since July 14, 2022, KRS 382.270 deems that instrument validly lodged for record anyway, and puts every interested party on constructive notice of what it says. If you are buying commercial property in Lexington, that single sentence changes what a defective notary block in the chain actually means to you.

    Last updated: October 12, 2026

    Does a Kentucky deed that was never acknowledged give constructive notice?

    Yes, if it was lodged for record. Since July 14, 2022 the statute deems it validly lodged and places all interested parties on constructive notice of its contents.

    The operative sentence of KRS 382.270(1) reads: “However, if a deed or deed of trust or mortgage conveying a legal or equitable title to real property is not so acknowledged or proved according to law, but is or has been otherwise lodged for record, such deed or deed of trust or mortgage conveying a legal or equitable title to real property or creating a mortgage lien on real property shall be deemed to be validly lodged for record for purposes of KRS Chapter 382, and all interested parties shall be on constructive notice of the contents thereof.”

    The first half of the same subsection still carries the old rule: an instrument is not valid against a purchaser for a valuable consideration without notice, or against creditors, until it is acknowledged or proved according to law. The 2022 amendment did not delete that. It added a second route — actually being in the record — that produces constructive notice on its own.

    What changed on July 14, 2022, and what it was before

    The amendment arrived as 2022 Ky. Acts ch. 167, sec. 1, with an effective date of July 14, 2022, printed in the statute’s own history line. The same act created KRS 382.285, which gives a purchase money deed of trust or mortgage granted by a purchaser priority over a prior lien under KRS 426.720 against that purchaser — and which is now the express exception at the front of KRS 382.270(1).

    So one act did two things to the recording chapter on the same day: it stopped a defective acknowledgment from erasing the notice value of a recorded instrument, and it settled a priority question for purchase money financing. Both matter to a buyer reading a chain of title, and neither is obvious from the section headings.

    A bad notary block no longer makes a recorded instrument invisible. It is in the record, and the record is notice.

    What this does not fix

    Three limits are worth writing on the diligence list, because the 2022 amendment leaves all three alone.

    It is about instruments in the record, not instruments nobody filed. KRS 382.080(1) is the older rule and still reads that no deed conveying any title to or interest in real property, or lease of oil, gas, coal or mineral right and privilege, “for a longer time than five (5) years” is good against a purchaser for a valuable consideration without notice, or any creditor, unless it is acknowledged by the party who executes it, or is proved and lodged for record. That statute has been effective since October 1, 1942. An interest that was never lodged at all gets no help from the 2022 language — which is the practical argument for recording a memorandum of lease on any commercial term that runs past five years.

    It does not cure what the clerk is told to refuse. KRS 382.110(2) directs a county clerk not to admit to record any deed conveying an interest equal to or greater than a life estate unless the deed plainly specifies and refers to the immediate source from which the grantor derived title — the source-of-title recital. Constructive notice from a recorded instrument and admissibility to record are two different gates.

    It does not make the instrument correct. Notice of the contents of a document is not a holding that the document does what it appears to do. A deed with a defective execution can be on record, give everyone notice, and still be the subject of a dispute about what it conveyed.

    The two routes to constructive notice, side by side

    SituationBefore July 14, 2022Now, under KRS 382.270(1)
    Deed properly acknowledged and recordedValid against purchasers without notice and creditorsUnchanged
    Deed recorded, acknowledgment defective or missingNot valid against a purchaser for a valuable consideration without notice, or creditors, until acknowledged or provedDeemed validly lodged for record; all interested parties on constructive notice of the contents
    Interest never lodged for recordNot good against a purchaser without notice under KRS 382.080Unchanged — KRS 382.080 still governs
    Purchase money mortgage vs a prior KRS 426.720 lienGoverned by general priority rulesKRS 382.285 gives the purchase money instrument priority against the purchaser

    How this lands in a Lexington commercial file

    In practice the title commitment is where this surfaces, and it surfaces as an exception rather than a headline. An older instrument with a thin or missing acknowledgment in the chain used to invite a question about whether it was effective notice to later purchasers; after July 14, 2022 the notice question has a statutory answer, and the remaining argument is about what the instrument actually did. Those are different conversations with different costs, and knowing which one you are in before the inspection period runs is the whole point of reading the chain early.

    The habit worth keeping, in commercial work generally: read the recording data on every instrument in the chain, not just the vesting deed. Book, page, date of recording and the acknowledgment are four lines that take a minute each and decide whether a question is a footnote or a repair. Fayette County recording fees are small enough that nothing in this chapter is worth leaving unrecorded on purpose.

    Does the 2022 amendment apply to instruments recorded before that date?

    The statute’s language is “is or has been otherwise lodged for record,” which reaches instruments already in the record as well as new ones. How that reads against a particular older chain is a question for the lawyer and the title underwriter on your file, not a question a statute quotation settles.

    Who counts as a “creditor” under KRS 382.270?

    Subsection (2) defines it broadly: “creditors” includes all creditors irrespective of whether or not they have acquired a lien by legal or equitable proceedings or by voluntary conveyance.

    Is a commercial lease an instrument that has to be recorded?

    KRS 382.080 speaks to interests conveyed for longer than five years. Where a commercial term runs past that line, recording — commonly a memorandum rather than the full lease — is what puts a later purchaser on notice. Under five years, the statute’s five-year clause is not the problem; the practical questions become possession, estoppel certificates and the rent roll.

    Sources: KRS 382.270 (effective July 14, 2022; amended 2022 Ky. Acts ch. 167, sec. 1), KRS 382.285 (effective July 14, 2022; created 2022 Ky. Acts ch. 167, sec. 3), KRS 382.080 (effective October 1, 1942) and KRS 382.110, Kentucky Legislative Research Commission, read October 12, 2026. Statutory text quoted as published. General information about Kentucky recording law, not legal advice — a chain of title question belongs with your closing attorney and title underwriter.

    By Marcos Gil, REALTOR® — Keller Williams Commonwealth · KY Real Estate License No. 296259 · Call or text (859) 310-1209.

  • What a Kentucky Deed’s Source-of-Title Recital Actually Proves

    Corridor Notes · Title & Records

    A Kentucky deed’s source-of-title recital is a recording requirement, not a title guarantee. KRS 382.110 tells the county clerk to refuse a deed that doesn’t carry one — and then, eight subsections later, says a deed lodged against that rule is still not invalid. For a commercial buyer reading a chain of title before an offer, the gap between those two sentences is the whole lesson.

    Last updated: October 11, 2026

    What does a Kentucky deed’s source-of-title recital actually tell you?

    It names the immediate source the grantor took title from — the prior instrument’s office, book, page and recording date, or, for unrecorded title, how and from whom.

    Subsection (2) is the operative sentence: a county clerk or deputy “shall not admit to record any deed of conveyance of any interest in real property equal to or greater than a life estate unless the deed plainly specifies and refers to the immediate source from which the grantor derived title.” Subsection (4) sets the format. If the source is a recorded writing, the new deed has to “refer to the former deed or writing, and give the office, book, and page where recorded, and the date of recording.” If title came in by inheritance or any other route that was never recorded, the deed has to “state clearly and accurately how and from whom the title to the property or interest was obtained by the grantor.”

    Note the word immediate. The recital is one link, not a chain. It is a pointer to the deed before this one — nothing in KRS 382.110 requires the grantor to carry the history back any further than that.

    Why is the county clerk not a diligence backstop?

    Because the statute that tells the clerk to refuse a bad deed also tells the clerk they are not liable for the content of the recital they accepted.

    Subsection (6) is mutual: “A grantor shall not lodge for record, and a county clerk or deputy shall not receive and permit to be lodged for record, any deed that does not comply with this section.” Then subsection (7) removes the teeth. A clerk “shall not be liable for the fine imposed by KRS 382.9901 because of any erroneous or false references in any deed, nor because of the omission of a reference required by law where it does not appear on the face of the deed that the title to the property or interest conveyed was obtained from more than one source.”

    Read that as a practical instruction. The clerk is checking that a recital is present and formally complete. The clerk is not checking that it is true, and is expressly not on the hook if it is false. A recital that cites a book and page which do not contain what it claims will record exactly as smoothly as a correct one.

    The recital is a filing rule with a clerk-side penalty and a buyer-side blind spot. It proves someone wrote a book and page down. It does not prove the book and page say what the deed claims they say.

    Where does the recital go silent entirely?

    Three places, all inside subsection (8): court-officer deeds, deeds made before March 20, 1928, and the validity question itself.

    Subsection (8) reads: “This section does not apply to deeds made by any court commissioner, sheriff, or by any court officer in pursuance of his or her duty as a court officer, nor to any deed or instrument made and acknowledged before March 20, 1928. A deed shall not be invalid because it is lodged contrary to this section.”

    Each clause matters for a different kind of commercial file. The court-officer exemption covers master commissioner deeds out of a foreclosure or judicial sale — a routine way commercial assets change hands in Kentucky — and those deeds carry no source-of-title recital because the statute never asked them to. The 1928 cut-off means an old deed in the chain can be lawfully silent. And the last sentence is the one that disposes of the question most buyers actually ask: a missing or defective recital is not a title defect. It is a filing violation that the legislature expressly declined to make fatal.

    What does an assembled parcel have to show?

    Each source separately, plus a map of which part of the property came from which source — the requirement that commercial assemblages trip over and residential deeds almost never reach.

    Subsection (5) is the one worth reading twice if you are buying anything an LLC put together out of adjoining lots: where title “is obtained from two or more sources, the deed offered for record shall plainly specify and refer to each of the sources in the manner provided in subsections (2) and (4) of this section, and shall show which part of the property, or interest in the property, was obtained from each of the sources.”

    That is a part-to-source allocation, not a list. A four-lot assemblage conveyed out as one tract should tell you, on the face of the deed, which quarter of the ground came from which grantor and when. When it doesn’t — and subsection (7) means the clerk had no duty to notice — you are looking at the exact file where a survey and a title commitment earn their fee. Loop it in with the Fayette County deed recording fees and transfer tax you will pay at the window, and with any recorded purchase-of-development-rights restriction that may ride on one of the component lots and not the others.

    KRS 382.110 subsectionWhat it requiresWhat it means before you sign
    (2)Recital of the immediate source, for any interest at or above a life estateOne link back, not a chain
    (4)Office, book, page and recording date — or how and from whom, if unrecordedGives you something to go verify
    (5)Each source named and part-to-source allocationThe assemblage test
    (6)Grantor must not lodge, clerk must not receive, a non-compliant deedThe gate, in theory
    (7)Clerk not liable for erroneous or false referencesThe gate, in practice
    (8)Court-officer and pre-1928 deeds exempt; a non-compliant deed is still validSilence is sometimes lawful
    (9)Deed in lieu of foreclosure filed within 45 days of executionA real clock
    (10)Commissioner’s deed under KRS 426.577 filed by the grantee within 5 business daysA shorter clock

    Which filing clocks does the same statute set?

    Two, both easy to blow past. Forty-five days for a deed in lieu of foreclosure, and five business days for a court commissioner’s deed.

    Subsection (9): a mortgage holder “shall file a deed in lieu of foreclosure in the county clerk’s office of the county in which the property conveyed, or the greater part of the property conveyed, is located, no later than forty-five (45) days after the date the deed in lieu of foreclosure is executed.” Subsection (10)(a): a deed filed under KRS 426.577 “shall be filed by the grantee within five (5) business days of receipt of the deed from the commissioner appointed by a court to convey the property.” And (10)(b) gives a city a remedy — if the property sits inside a municipal government’s boundaries and the grantee has not filed within thirty business days of receipt, the municipal government may petition the Circuit Court of the county where the property lies.

    Subsection (1) is the venue rule underneath all of it: deeds, mortgages and other instruments required to be recorded to be effectual against purchasers without notice, or creditors, are recorded in the clerk’s office of the county where the property — or the greater part of it — is located. For Fayette County that search runs through the Fayette County Clerk’s Fayette County Online Records index. A multi-county commercial tract is a reminder that “greater part” is doing load-bearing work in that sentence.

    How I read a recital, in order

    In my own practice the recital is the first thing I read on a deed and the last thing I trust. I read it to generate a to-do, not to close one: it hands me a book and page, and the only thing that matters next is whether I can pull that instrument and find the grantor named there conveying what this deed says they conveyed. Three habits have earned their keep. First, count the sources before counting anything else — a single-source recital on a parcel that is obviously an assemblage is a question, not an answer. Second, treat a commissioner’s deed as a deliberate blank rather than an omission, and go to the court file for the history the deed is exempt from carrying. Third, when a recital points at a book and page, actually open it. Subsection (7) is the legislature telling you, in writing, that nobody upstream of you was required to.

    None of that is a substitute for a title examination by a Kentucky attorney, and I don’t offer one. It is the difference between walking into that examination with a question list and walking in with nothing. If the deal involves a lease the seller wants kept off the record, the same recording instinct applies to a memorandum of lease in a Kentucky commercial deal.

    Questions buyers ask about the recital

    Does a missing source-of-title recital void my deed?

    No. KRS 382.110(8) says in terms that “a deed shall not be invalid because it is lodged contrary to this section.” The recital is a condition of recording, and subsection (6) is directed at the grantor and the clerk. A defect there is a problem to clean up, not a conveyance that failed. What it can affect is the record itself — and the record is what a later purchaser without notice relies on under subsection (1).

    Why does the commissioner’s deed from a foreclosure sale have no recital?

    Because subsection (8) exempts it. KRS 382.110 “does not apply to deeds made by any court commissioner, sheriff, or by any court officer in pursuance of his or her duty as a court officer.” The history you would have read in a recital lives in the court file instead — the judgment, the order of sale, and the order confirming it. Budget diligence time for the record you have to go get rather than the one you expected to be handed.

    What else does a Kentucky deed have to contain?

    KRS 382.135 adds the full names of grantor and grantee, both mailing addresses, a statement of the full consideration, the in-care-of address for the property tax bill for the transfer year, and a sworn notarized consideration certificate. Subsection (2) exempts the consideration, tax-bill-address and certificate items for six narrow deed types, including utility easements, divorce-proceeding transfers, cemetery lots and deeds correcting an error between the same grantor and grantee. Subsection (3) handles exchanges: the fair cash value of the property being exchanged is stated in the body of the deed.

    Sources: KRS 382.110 and KRS 382.135, Kentucky Legislative Research Commission, read October 11, 2026. Statutory text quoted as published. This is general information about Kentucky recording requirements, not legal advice; a title examination is a lawyer’s work.

    By Marcos Gil, REALTOR® — Keller Williams Commonwealth · KY Real Estate License No. 296259 · Call or text (859) 310-1209.

  • Kentucky Landlord-Tenant Act: Local Option & Farm Exclusion

    Corridor Notes · Leases & tenancy

    Kentucky’s landlord-tenant act is not statewide. Under KRS 383.500 each city, county or urban-county government decides whether to adopt it — and KRS 383.535 pulls seven kinds of occupancy out of it, including a dwelling that sits on farm land.

    That matters on the commercial and investment side more than people expect. A Lexington-area deal often carries a dwelling along with it: the tenant house on a horse farm, the caretaker’s cottage on a timber tract, the single unit above a storefront. Whether that occupant is covered by the Uniform Residential Landlord and Tenant Act is not a property feature you can read off the listing. It is a function of which government’s ordinance the dwelling sits under — and, under subsection (7), of what the surrounding land is used for.

    Is Kentucky’s landlord-tenant act statewide?

    No. KRS 383.500 authorizes cities, counties and urban-county governments to enact URLTA; it does not impose it. Absent local adoption, the Act does not apply.

    The statute’s own words are the operative part: the General Assembly “authorizes cities, counties and urban-county governments to enact the provisions of the Uniform Residential Landlord and Tenant Act as set forth in KRS 383.505 to 383.705.” That text has been in force since July 13, 1984 and is published by the Legislative Research Commission at KRS 383.500, Kentucky Legislative Research Commission.

    So the first question on an occupied unit is not “what does Kentucky law require?” It is “has this jurisdiction adopted KRS 383.505 to 383.705?” Confirm that with the city or county whose boundary the parcel actually falls inside, not with a statewide summary.

    What does “in their entirety and without amendment” bar?

    It bars a local half-measure. KRS 383.500 says that if the provisions are adopted, they “shall be adopted in their entirety and without amendment” — and then forecloses any substitute ordinance.

    The second sentence is the one worth reading twice: “No other ordinance shall be enacted by a city, county or urban-county government which relates to the subjects embraced in KRS 383.505 to 383.705.” Read together, those two sentences produce a binary. A jurisdiction either has the whole Act or it has no local landlord-tenant ordinance at all on those subjects. There is no third category to diligence, which is genuinely useful: one question to the right local government resolves the entire issue.

    Coverage is not a feature of the building. It is a function of whose ordinance the building sits under — and, on acreage, of what the land is used for.

    Which occupancies does KRS 383.535 pull out of the Act?

    Seven. Even inside an adopting jurisdiction, KRS 383.535 lists seven arrangements that KRS 383.505 to 383.715 do not govern — and the last one is about land use, not about the building.

    KRS 383.535Arrangement not governed by the Act
    (1)Residence at a public or private institution, incidental to detention or to medical, geriatric, educational, counseling or religious service
    (2)Occupancy under a contract of sale of the dwelling unit or the property it is part of, where the occupant is the purchaser or a successor to that interest
    (3)Occupancy by a member of a fraternal or social organization in the portion of a structure operated for the organization’s benefit
    (4)Transient occupancy in a hotel or motel, or lodgings subject to state transient lodgings or room occupancy excise tax
    (5)Occupancy by an employee of a landlord whose right to occupy is conditional upon employment in and about the premises
    (6)Occupancy by the owner of a condominium unit, or the holder of a proprietary lease in a cooperative
    (7)Occupancy of a dwelling unit located on land devoted to the production of livestock, livestock products, poultry, poultry products, or the growing of tobacco or other crops including timber
    Source: KRS 383.535, Exclusions from application, Kentucky Legislative Research Commission. Effective July 13, 1984.

    Why does the farm exclusion matter to a commercial buyer?

    Because it travels with the land use, not the lease. A dwelling on a tract devoted to livestock, poultry, tobacco, other crops or timber falls outside the Act even where the city or county has adopted it.

    Three practical consequences follow for the kind of tract that trades around Lexington and the surrounding counties:

    • The same house can change status. Subsection (7) keys off what the land is devoted to. A tenant house on a working hay and cattle tract and the identical house on a subdivided residential lot are not in the same statutory position.
    • Timber counts. The exclusion names “other crops including timber” explicitly — so a recently or actively managed timber tract with a dwelling on it is squarely inside subsection (7)’s language.
    • The lease becomes the whole agreement. Where (7) applies, the Act’s notice periods, deposit handling and habitability machinery are simply not the governing law. What the written lease says is what there is.

    In my own practice the first question on an investment tract with an occupied dwelling is not what the lease says about repairs — it is which government’s ordinance that lease was written under, and what the surrounding acreage is actually being used for. Those two answers decide which body of rules the rest of the conversation sits in, and they are both knowable before an offer goes out. I am an agent, not your attorney: on a tract where subsection (7) is arguable, the answer comes from Kentucky counsel reading the lease and the land use together.

    What does a commercial lease rely on instead?

    Its own four corners. KRS 383.500’s authorization reaches only KRS 383.505 to 383.705 — the residential act — so a commercial tenancy has no analogous local opt-in regime to inherit.

    That is why the allocation language in a commercial lease does so much work, and why it is worth reading closely before closing rather than after. Our walk-through of how a triple-net lease allocates costs in Lexington covers where those obligations usually land, and the memorandum of lease a Kentucky commercial buyer should look for in the record explains how an existing tenancy shows up in the county record at all. If the property generates rent, the Lexington occupational license fee on rental property is the next filing question after the lease itself.

    What should you ask before the offer goes out?

    Four questions, all answerable without the seller’s cooperation except the last.

    1. Which city, county or urban-county government’s boundary does the parcel sit inside? Not the mailing address — the jurisdiction.
    2. Has that government adopted KRS 383.505 to 383.705? Ask it directly; KRS 383.500 makes this a yes-or-no.
    3. What is the land devoted to? If the answer involves livestock, poultry, tobacco, other crops or timber, read KRS 383.535(7) before you assume the Act applies.
    4. Is there a written lease, and does it match what the occupant believes? Where (7) or a non-adopting jurisdiction is in play, that document is the governing law.
    Does Lexington-Fayette Urban County fall under URLTA?

    KRS 383.500 names urban-county governments among those authorized to adopt the Act, so the mechanism is available to Lexington-Fayette. Whether the ordinance is on the books is a question for the urban-county government itself, and that is where the answer should come from rather than from a statewide summary. Verify it in writing for the specific parcel before you rely on it.

    If a jurisdiction has not adopted URLTA, is a residential tenant unprotected?

    It means the Act’s specific machinery does not apply there. Common-law principles, the written lease, and other statutes outside KRS 383.505 to 383.705 still operate. The point for a buyer is narrower: do not assume URLTA’s notice periods or deposit rules govern a unit until you have confirmed adoption.

    Does subsection (7) depend on how much of the tract is farmed?

    The statute’s text turns on the dwelling unit being “located on land devoted to” the listed uses, and it sets no acreage or percentage threshold. That silence is exactly why a mixed-use tract is a question for counsel rather than a judgment call at the offer stage.


    Last updated: October 10, 2026

    By Marcos Gil, REALTOR® — Keller Williams Commonwealth · KY Real Estate License No. 296259 · Call or text (859) 310-1209.

    Educational information about Kentucky statutes, not legal advice. I am a real estate agent, not an attorney and not a lender. Marcos Gil also owns Central Property Services and publishes investinthegorge.com and marcosgilrealty.com.

  • Purchase of Development Rights in Fayette County: The Check Before an Offer

    Corridor Notes · Rural Land & Easements

    A Purchase of Development Rights easement in Fayette County is a permanent, recorded restriction that removes a farm’s right to be developed — and it does not appear in the zoning. A rural-service-area parcel can be zoned Agricultural Rural, have no zoning problem at all, and still be unbuildable because the development rights were sold years ago. Lexington publishes the easement, the parcel flag and the full farm list for free, which means this is a check you can finish before you write an offer, not after.

    What is a Purchase of Development Rights easement?

    It is an agricultural conservation easement. The farm owner sells the right to develop the land to a public board, keeps fee simple title, and keeps farming — permanently.

    The program is run by the Rural Land Management Board and described on the City of Lexington Purchase of Development Rights page, which calls PDR “Kentucky’s first Agricultural Conservation Easement program facilitated by a local government” and states that the board purchases a farm owner’s development rights, “preserving it as farmland forever.” The board is appointed by the mayor, confirmed by the Urban County Council, and uses Ordinance 4-2000 and Chapter 26 of the LFUCG Code of Ordinances as its guide.

    The word that matters to a buyer is forever. This is not an agricultural assessment that lapses when the use changes, and it is not a zoning classification that a future council can amend. It is a deed restriction that survives every sale after it.

    How do I tell whether a Fayette County farm is in the PDR program?

    Three free checks, in this order: the PVA parcel record carries a PDR flag, the city publishes a searchable list of every PDR farm, and the easement itself downloads from the County Clerk.

    The city’s own instructions are specific on all three. On the parcel record, “The PVA includes PDR in their list for each parcel. If the farm is a part of the program, there will be a Y. If it is not part of the program, the section will be blank” — a one-character answer you can read in the Fayette County Property Valuation Administrator record. The city also links a searchable spreadsheet of all PDR farms, and says PDR easements “may be obtained/downloaded (for free) on the County Clerk’s website. You need to only type the street number and name to find the easement.”

    That sequence is worth running in that order because each step answers a different question. The PVA flag tells you whether. The farm list tells you how much of the parcel and which neighbours are in the same position. The recorded easement tells you what the restriction actually says, which is the only document that governs.

    A blank zoning objection and a blank PDR flag are two different findings. Only one of them is in the deed.

    What does a PDR easement stop a buyer from building?

    New or expanded housing and new paving both require the board’s permission first. On farms eased in 2007 or later, barns and equipment sheds do too, because of an impervious surface limit.

    The city states that the easement “requires landowners to obtain permission from the [board] before adding new housing or expanding existing housing and before adding paving,” and adds: “If your farm was eased in 2007 or after, it likely includes an impervious surface limit, so adding farm infrastructure, such as barns, equipment sheds, etc., also requires approval.” Requests go to the PDR director on a Housing and Infrastructure Request Form and are considered at a regularly scheduled board meeting — the board meets at 3 p.m. on the fourth Wednesday of the month per the same page.

    Read the 2007 line twice if the plan involves any kind of structure. An impervious surface cap is not a design guideline; it is a number that every future roof, pad, drive and apron has to fit inside, and it does not care whether the use is agricultural, agritourism or commercial. If the easement year is 2007 or later, the cap — not the zone — is the real ceiling on the site, and the request process means a build schedule now has a monthly meeting date in it. That is also the point at which the land disturbance permit threshold and the easement limit have to be reconciled against each other rather than one at a time.

    How much Fayette County land is already under a PDR easement?

    314 farms, totalling nearly 33,529 acres, per the city’s PDR page read on October 8, 2026. In Scott County the comparable programme has protected five farms and 611 acres.

    Both figures come from the programmes themselves: the City of Lexington page states “There are 314 farms permanently protected by PDR, totaling nearly 33,529 acres,” and the Georgetown-Scott County Planning Commission states that Scott County’s PDR programme is “the second Agricultural Conservation Easement program by a local government in the Commonwealth of Kentucky” and that “Currently there are five (5) farms totaling 611 acres permanently protected by conservation easements.” Neither page carries a revision date, so both are reported as read on this date rather than as of a stated vintage.

    The contrast is the practical part. In Fayette County, 314 separate farms and nearly 33,529 acres is a large enough footprint that a rural-service-area parcel landing on an eased farm is an ordinary outcome rather than a freak one, which is why the PVA flag belongs in the first hour of diligence. One county north, the odds are different — Scott County’s programme has protected 611 acres against a stated annual goal of 2,000 acres per year, so the restriction is rare there and the search is still worth running, because rarity is not absence and the easement is permanent either way. If the target parcel is in Scott County, the Georgetown and Scott County entitlement questions are a separate list.

    Where this goes wrong in practice

    The failure I watch for is a diligence list organised by department instead of by document. A buyer asks the planning question of planning, the tax question of the PVA and the title question of the title company, and a recorded conservation easement sits in the gap between all three: it is not a zoning objection, it is not an assessment issue, and it will appear on a title commitment as an exception that reads like boilerplate unless somebody pulls the instrument and reads the restriction. The fix costs nothing. Before the offer, pull the PVA record for the PDR flag, and if the flag is a Y, download the easement from the Clerk and find the year it was recorded — because the year decides whether an impervious surface cap is in play. An agricultural use exemption from zoning answers a different question entirely, and having one does not tell you anything about whether the development rights still exist.

    Does a PDR easement expire or get released when the farm is sold?

    No. The city describes the result as preserving the land “as farmland forever,” and the restriction is recorded against the property, so it carries to every subsequent owner. Treat it as permanent unless a lawyer tells you otherwise after reading the recorded instrument.

    Can a small acreage parcel be in the programme?

    Yes. Lexington runs a Small Farm Program as an extension of PDR for farms between 10 and 19.99 acres, with a stated application deadline of November 2, 2026 on the city’s page. So a sub-20-acre tract is not automatically outside the programme, and the PVA flag is still the check.

    Is this the same thing as an agricultural assessment?

    No, and confusing the two is the common error. An agricultural assessment is a property tax valuation method tied to current use. A PDR easement is a permanent deed restriction on development rights. A parcel can carry one, both or neither, and the tax record will not tell you which.

    Last updated: October 8, 2026.

    By Marcos Gil, REALTOR® — Keller Williams Commonwealth · KY Real Estate License No. 296259 · Call or text (859) 310-1209.

  • The 1031 Exchange Deadline That Can End Before Day 180

    Corridor Notes · 1031 Exchange

    The two 1031 exchange deadlines every Lexington commercial seller is handed are “45 days to identify, 180 days to close.” The second one is not a flat 180 days. Under 26 CFR 1.1031(k)-1, the exchange period ends at midnight on the earlier of the 180th day after you transfer the relinquished property or the due date — including extensions — of your return for the tax year in which that transfer happened. Close in late December and the calendar, not the regulation, is what shortens your window.

    When does the 45-day identification period start?

    It starts the day you transfer the relinquished property and ends at midnight on the 45th day after that. There is no grace period and no extension.

    The regulation fixes both clocks to the same event. Paragraph (b)(2)(i) of 26 CFR 1.1031(k)-1 states the identification period “begins on the date the taxpayer transfers the relinquished property and ends at midnight on the 45th day thereafter.” Paragraph (b)(2)(iv) adds that property is transferred when it is disposed of within the meaning of section 1001(a) — so the trigger is the disposition, not the day the money lands or the day the deed is recorded.

    Why does the 180-day exchange period sometimes end early?

    Because the rule is an earlier-of test. Paragraph (b)(2)(ii) ends the exchange period on the 180th day or your return’s due date including extensions, whichever comes first.

    That is the sentence that catches people. Work the arithmetic on a calendar-year taxpayer who closes the sale on December 15: counting forward from that date, day 180 falls on June 13 of the following year, but an unextended individual return is due April 15 — day 121. On my count that is 59 days of exchange period gone, not because anyone missed a step, but because no extension was filed. Filing the extension is what restores the full 180 days, and it has to be filed before the original due date, which is itself inside the exchange window.

    A December closing does not shorten your exchange. An unfiled extension does.

    How many replacement properties can you identify?

    Three, with no regard to value — or any number whose combined value stays inside 200 percent of what you sold. Blow past both and the regulation treats you as having identified nothing.

    Paragraph (c)(4)(i) of 26 CFR 1.1031(k)-1 sets the ceiling at “(A) Three properties without regard to the fair market values of the properties (the ‘3-property rule’), or (B) Any number of properties as long as their aggregate fair market value as of the end of the identification period does not exceed 200 percent of the aggregate fair market value of all the relinquished properties” measured as of the transfer date. Paragraph (c)(4)(ii) is the consequence: identify more than that and “the taxpayer is treated as if no replacement property had been identified.”

    There is one escape hatch inside the same paragraph, and it is strict. An over-identification is still honoured if, before the exchange period ends, you actually receive identified replacement property worth at least 95 percent of the aggregate value of everything you identified — the 95-percent rule. It is a rule to understand, not a rule to plan around: it asks you to close on nearly the whole list.

    TestWhat it limitsMeasured when
    3-property ruleCount only — three, at any valueEnd of the identification period
    200-percent ruleCombined value of all identified propertyValues at end of identification period, against relinquished value at transfer
    95-percent ruleRescues an over-identificationWhat you actually receive by the end of the exchange period
    Source: 26 CFR 1.1031(k)-1(c)(4).

    What does a valid identification have to say, and who has to get it?

    A written document, signed by you, unambiguously describing the property, delivered before day 45 to a party in the exchange who is not you and not a disqualified person.

    Paragraph (c)(2) of 26 CFR 1.1031(k)-1 requires the designation to be “in a written document signed by the taxpayer and hand delivered, mailed, telecopied, or otherwise sent” before the period closes, to either the person obligated to transfer the replacement property or any other person involved in the exchange other than the taxpayer or a disqualified person; it names intermediaries, escrow agents and title companies as examples. Paragraph (c)(3) says real property “generally is unambiguously described if it is described by a legal description, street address, or distinguishable name.”

    Two details in the same paragraph are worth knowing before you need them. Revocation under (c)(6) is allowed any time before day 45, but only in a signed writing sent to the same person the identification went to — a phone call to your intermediary is not a revocation. And (c)(5) disregards incidental property that would normally transfer with the larger item, provided the incidental items together are worth no more than 15 percent of the larger item’s value, so ordinary fixtures and equipment do not quietly consume one of your three slots.

    What if you sell two properties in the same exchange?

    Both clocks run from the earliest transfer. Paragraph (b)(2)(iii) determines the identification and exchange periods by reference to the first relinquished property conveyed, not the last.

    For a Lexington owner unwinding two small retail buildings or a pair of flex bays on separate closing dates, that single sentence is usually the whole planning problem. Stagger the closings by three weeks and you have not bought three extra weeks — you have spent them.

    What this changes about how you sequence a sale

    In the commercial work I do here, the deadline that actually gets missed is almost never day 45. Identification is a document somebody is already chasing. What gets missed is the back end: an exchange that was planned as a comfortable six-month runway, counted off a December or a late-fall closing, with nobody at the table whose job it was to ask whether an extension would be filed. The practical habit is simple — before you agree to a closing date in the last quarter of the year, write down both candidate end dates and keep the earlier one in front of you. That is the one that governs.

    This is general information about how the deferred-exchange regulation reads, not tax advice. I am your real estate agent — I am not your CPA, your attorney or your qualified intermediary, and the people in those three seats are the ones who should confirm your dates and your structure before you sign anything. If you want help lining up the property side of an exchange, start with our 1031 exchange in Kentucky overview, and if income-producing replacement property is the goal, our notes on triple net lease property in Lexington cover what those assets look like locally. Our guide to selling commercial property in Lexington covers the relinquished side.

    Does the 45-day identification period ever get extended?

    Not by the regulation itself. Paragraph (b)(2)(i) ends it at midnight on the 45th day with no built-in extension mechanism. The only flexibility inside paragraph (c) is revocation and re-identification, and both have to happen before that same deadline.

    If I file a tax extension, do I get the full 180 days?

    The earlier-of test in paragraph (b)(2)(ii) compares the 180th day with the return due date “including extensions,” so a properly filed extension moves that second date later and the 180-day figure becomes the binding one. Confirm the filing with your CPA — the extension has to be in place before the original due date.

    Can I identify a property I have not negotiated yet?

    The regulation’s test is description, not control: paragraph (c)(3) asks only that the property be unambiguously described, by legal description, street address or distinguishable name. Nothing in paragraph (c) requires a contract to exist on day 45. Whether identifying something you have no deal on is a good idea is a separate question, and it is the one worth discussing with your intermediary.

    Last updated: October 7, 2026.

    By Marcos Gil, REALTOR® — Keller Williams Commonwealth · KY Real Estate License No. 296259 · Call or text (859) 310-1209.

  • ADA Path of Travel 20% Rule: Lexington Commercial Remodels

    Corridor Notes · Buildings & Compliance

    Altering a Lexington commercial space can obligate you to spend money on a part of the building you never intended to touch. The ADA path of travel rule, 28 CFR 36.403, Alterations: Path of travel, requires that when you alter an area containing a primary function, the route to that area — plus the restrooms, telephones and drinking fountains serving it — be made accessible, unless the cost is disproportionate to the overall alteration. “Disproportionate” is not a judgment call. The regulation attaches a number to it, and that number is 20 percent.

    What triggers the ADA path-of-travel obligation?

    An alteration that affects, or could affect, the usability of or access to an area of a facility that contains a primary function triggers it.

    The obligation runs to the maximum extent feasible, and it covers more than the doorway. A “path of travel” is defined in the regulation as a continuous, unobstructed way of pedestrian passage by which the altered area may be approached, entered and exited, connecting that area with an exterior approach — sidewalks, streets and parking areas — an entrance to the facility, and other parts of the facility. It may consist of walks and sidewalks, curb ramps and other ramps, clear floor paths through lobbies and corridors, parking access aisles, elevators and lifts, or a combination. And for purposes of the rule, the term also includes the restrooms, telephones and drinking fountains serving the altered area.

    There is one grandfather clause worth knowing. If a private entity already built or altered the required path-of-travel elements to the specifications in the 1991 Standards, it is not required to retrofit those elements to reflect the incremental changes in the 2010 Standards solely because of a later alteration to a primary function area served by that path. The current benchmark for new work is the 2010 ADA Standards for Accessible Design.

    Which areas count as a primary function — and which do not?

    A primary function is a major activity for which the facility is intended. Offices and work areas count. Restrooms, corridors, entrances, mechanical rooms and storage rooms do not.

    The regulation gives examples on both sides of the line. Areas containing a primary function include the customer services lobby of a bank, the dining area of a cafeteria, the meeting rooms in a conference center, and offices and other work areas where the activities of the business are carried out. Areas that do not contain a primary function include mechanical rooms, boiler rooms, supply storage rooms, employee lounges or locker rooms, janitorial closets, entrances, corridors and restrooms.

    That second list is the part buyers misread. Renovating the restrooms in a Lexington office building is not, by itself, an alteration to a primary function area — so it does not trigger a path-of-travel obligation. Remodeling the offices those restrooms serve is, and it does.

    The regulation also names work that is expressly not deemed to affect usability or access: alterations to windows, hardware, controls, electrical outlets and signage. Replacing the light switches and the suite signage in a Hamburg office condo is not a path-of-travel trigger. Replacing an inaccessible floor surface in a bank’s customer service area is — the rule lists that one by name, along with remodeling merchandise display or employee work areas in a department store, redesigning a factory assembly line area, and installing a computer center in an accounting firm.

    How much of the budget can the path of travel consume?

    Up to 20 percent. Path-of-travel work is deemed disproportionate when its cost exceeds 20 percent of the cost of the alteration to the primary function area.

    The denominator matters as much as the percentage: it is the cost of the alteration to the primary function area, not the cost of the whole project including the path-of-travel work. The regulation then lists the costs you are allowed to count toward the 20 percent, which is the list to hand your contractor before the bid is final.

    Countable path-of-travel costExamples given in 28 CFR 36.403(f)(2)
    Accessible entrance and routeWidening doorways, installing ramps
    Accessible restroomsGrab bars, enlarging toilet stalls, insulating pipes, accessible faucet controls
    Accessible telephonesRelocating to an accessible height, amplification devices, text telephone (TTY)
    Drinking fountainsRelocating an inaccessible drinking fountain

    Twenty percent is not a cap on your obligation. It is the point at which the obligation stops growing — and the order in which you spend it is already written down.

    What gets fixed first when 20 percent does not cover everything?

    The path of travel still has to be made accessible to the extent it can be without disproportionate cost, and the regulation sets the priority order.

    In choosing which accessible elements to provide, priority should be given to those that provide the greatest access, in this order: an accessible entrance; an accessible route to the altered area; at least one accessible restroom for each sex or a single unisex restroom; accessible telephones; accessible drinking fountains; and, when possible, additional accessible elements such as parking, storage and alarms.

    Read that list as a spending sequence rather than a wish list. A plan that puts an accessible drinking fountain ahead of an accessible entrance is out of order on the face of the regulation, regardless of what it cost.

    Can the work be phased into smaller pieces to stay under the cap?

    No. The regulation anticipates exactly that move and closes it with a three-year look-back.

    Section 36.403(h) says the obligation may not be evaded by performing a series of small alterations to the area served by a single path of travel if those alterations could have been performed as a single undertaking. If a primary function area was altered without providing an accessible path of travel, and subsequent alterations of that area — or of a different area on the same path of travel — are undertaken within three years of the original alteration, the total cost of alterations to the primary function areas on that path of travel during the preceding three-year period is what gets tested against the 20 percent. Only alterations undertaken after January 26, 1992 count toward that total.

    For a buyer, that turns a seller’s recent renovation history into a diligence question rather than a selling point. Three years of phased work on the same corridor is three years of denominator.

    Does a tenant’s build-out obligate the landlord?

    Not automatically. If a tenant makes alterations that would trigger the rule, those alterations in areas only the tenant occupies do not impose a path-of-travel obligation on the landlord with respect to areas under the landlord’s authority, if those areas are not otherwise being altered.

    That is a narrow carve-out, and it is written around who occupies the space and who else is doing work. It is not a general statement that landlords are off the hook. In a multi-tenant Lexington building where the owner is also refreshing the lobby in the same season, the predicate for the carve-out — that the landlord’s areas are not otherwise being altered — is the fact in dispute.

    Where this shows up in a Lexington commercial deal

    In my work representing commercial buyers and tenants in Fayette County, the pattern is consistent: the accessibility question arrives after the budget is set. A buyer prices the build-out off a contractor’s walk-through, signs, and then discovers during permitting that the route from the parking area to the altered suite is part of the project. The professional habit worth building is to ask the accessibility question at the same time you ask the zoning question, not after. Two things make that cheap to do: identify in writing which rooms are primary function areas and which are not, and ask the seller for the alteration history of the suite and the shared corridor going back three years. Both answers are free to obtain before a contract is signed and expensive to discover afterward.

    This question travels with two others on the same deal. Whether your project is legally an alteration at all is covered in change of use versus alteration on Lexington commercial property, and whether the finished space can be occupied is covered in the certificate of occupancy in Lexington. If the suite’s current use is grandfathered, read nonconforming use in Lexington as well, because losing the grandfather and triggering an alteration tend to happen in the same month.

    None of this is legal advice and I am not your attorney. The Department of Justice enforces Title III, the building official reviews the permit, and an accessibility consultant or architect prices the path of travel. My job is to make sure the 20 percent line item exists in the model before the offer goes out.

    Does the 20 percent test apply to new construction?

    No. Section 36.403 is written for alterations. New construction is governed by the new-construction requirements, where there is no disproportionality allowance to begin with — the facility is designed accessible from the start.

    Is painting or recarpeting an office an alteration that triggers the rule?

    The test in the regulation is whether the work affects or could affect the usability of or access to an area containing a primary function. Replacing an inaccessible floor surface in a customer service or employee work area is listed as work that does. Cosmetic work that changes nothing about usability or access is a different question, and it is one for the building official and your design professional on the specific scope.

    Who decides whether the cost is disproportionate?

    The regulation supplies the arithmetic — more than 20 percent of the cost of the alteration to the primary function area — but the documentation is the owner’s. Keep the cost breakdown that shows the denominator, the countable path-of-travel costs, and which priority elements were provided, because that record is what the test is run against later.

    Last updated: October 6, 2026.

    By Marcos Gil, REALTOR® — Keller Williams Commonwealth · KY Real Estate License No. 296259 · Call or text (859) 310-1209.

  • Land Disturbance Permit Lexington KY: The 5,000 Sq Ft Line

    Corridor Notes · Site Work & Stormwater

    A land disturbance permit in Lexington KY is triggered at 5,000 square feet of clearing, grading, excavating or filling — about one-ninth of the acre that triggers the federal construction stormwater rule. Most of the commercial site work that needs a Lexington permit is far too small to need a state or federal one, which is exactly why buyers miss it. This is the pre-offer version of that reading.

    What triggers a land disturbance permit in Lexington KY?

    Clearing, grading, excavating or filling an area of 5,000 square feet or more. At that point you need an Erosion and Sediment Control Plan and a Land Disturbance Permit from Engineering before work starts.

    The threshold is published by the Lexington-Fayette Urban County Government, which states that “if you will be clearing, grading, excavating, and filling an area of 5,000 square feet or more, you must develop an Erosion and Sediment Control Plan,” and that the Land Disturbance Permit comes from Engineering before those activities begin.

    5,000 square feet is a 50-by-100-foot rectangle. A parking field re-grade, a loading-dock apron, a pad site, a detention basin cleanout, a demolished outbuilding and its backfill — any one of those clears 5,000 square feet without looking like a construction project to a buyer walking the site.

    How is that different from the federal stormwater threshold?

    By a factor of roughly nine. The federal construction stormwater permit starts at one acre; Lexington’s local permit starts at 5,000 square feet.

    The U.S. Environmental Protection Agency sets the national trigger at construction activities disturbing “1 acre or more of land, or less than 1 acre of land, but that is part of a common plan of development or sale that will ultimately disturb 1 or more acres of land.” An acre is 43,560 square feet. Dividing the two published figures gives the gap plainly: 5,000 square feet is 11.5 percent of an acre, so Lexington’s permit fires at roughly one-ninth of the federal threshold. That arithmetic is mine, derived from the two agencies’ own numbers — neither agency publishes the comparison.

    The permit a Lexington buyer actually trips over is the local one, and it is nine times more sensitive than the federal rule everyone has heard of.

    The practical consequence is a diligence order of operations. Checking the federal or state stormwater question first and finding nothing tells you nothing about Lexington. The common-plan-of-development language in the federal rule also means phased work that stays under an acre per phase can still cross the federal line in aggregate — a second trap, running the opposite direction.

    What happens after the permit is issued?

    Inspections, on a published cadence. LFUCG states that once work begins, “your site will be inspected by staff from Water Quality at least monthly, and twice a month if the site is targeted due to its size or proximity to a water body.”

    That second clause is the one worth pricing. Inspection frequency is not a function of your project alone — it is a function of where the parcel sits. Two identical pad sites, one of them near a stream, carry different oversight load and different odds of a stop-work correction. If a parcel you are underwriting backs onto a drainage way, assume the twice-monthly tier and budget the contractor’s time for it.

    Which rulebook does the project inherit?

    Whichever one was in force when the improvement plan was initiated, not when you close. Lexington runs three eras of stormwater guidance at once, and the project’s start date decides which applies.

    Improvement plan initiatedGuidance that applies
    Before Oct. 1, 20202016 Stormwater Manual
    Oct. 1, 2020 to Apr. 30, 2026The prior-to-May-1-2026 guidance set
    On or after May 1, 20262026 Stormwater Manual and Procedure Manuals
    Source: LFUCG Engineering, current and prior-to-May-1-2026 development pages, read October 4, 2026.

    For anything you are buying this autumn, that May 1, 2026 line is live. A half-finished project on the parcel may be carrying 2020-era guidance while the plan you intend to file next spring will not be. Ask the seller for the date the improvement plan was initiated, in writing, and ask Engineering which manual that date lands in. Those are two different questions and the second one is the one that binds you.

    What this looks like in practice

    In my own practice, the land disturbance question is the one that most often arrives late, and it arrives late for a structural reason: it is not a zoning question, so it does not surface in the zoning review a buyer orders first, and it is not a building question, so it does not surface in plan review either. It sits with Engineering, between the two. The habit I keep is to ask, before an offer is written, one flat question about every square foot of dirt the plan intends to move — not whether the project needs a permit, but how many square feet it disturbs. The number answers the permit question by itself, and it is a number a seller or a contractor can give you in a sentence. I write about process and documents here rather than about particular deals, which is a deliberate limit: the permit path is checkable, and a deal story is not.

    Where this sits in a pre-offer check

    Alongside the other approvals that are issued by someone other than the planning office. The commercial entrance permit on a state-maintained route is the same shape of problem — a separate agency, a separate queue, invisible to a local permit search. The Lexington zoning guide covers the use question, and a conditional use permit covers the cases where the use is only conditionally allowed. Land disturbance is the fourth lane, and it is the cheapest of the four to check.

    Does demolition count toward the 5,000 square feet?

    LFUCG groups demolition projects with new development and redevelopment on the same Engineering page, and the triggering activities it names are clearing, grading, excavating and filling. Backfilling a demolished footprint is filling. Confirm the specific scope with Engineering rather than assuming demolition is exempt.

    Can a project need the Lexington permit but not the federal one?

    Yes, and that is the common case. Anything between 5,000 square feet and one acre of disturbance is above the local threshold and below the federal one, unless it is part of a common plan of development that will ultimately disturb an acre or more.

    How long does a land disturbance permit review take?

    LFUCG does not publish a review time for it, and anyone who quotes you one is guessing. What is published is the requirement that the permit be obtained before land disturbing activities begin — so the schedule risk is real even though the duration is not stated. Ask Engineering for current turnaround on your submittal type.

    Last updated: October 4, 2026

    By Marcos Gil, REALTOR® — Keller Williams Commonwealth · KY Real Estate License No. 296259 · Call or text (859) 310-1209.

    This article is general information about a local permitting process, not legal or engineering advice and not a prediction of any permit outcome. Thresholds and manual editions change; verify current requirements with LFUCG Division of Engineering before relying on them.

  • Commercial Entrance Permit Kentucky: Before You Offer

    Corridor Notes · Access & Right of Way

    A commercial entrance permit in Kentucky is issued by the Transportation Cabinet, not by the city or county planning office, whenever the driveway you intend to use touches a state-maintained highway. That single fact reorders a Lexington commercial deal, because the approval you need most is the one nobody in the local permit office can give you. This is the pre-offer version of that reading.

    Who issues a commercial entrance permit in Kentucky?

    The Department of Highways district office for the county the access point sits in. Not the planning commission, and not the building inspector.

    Kentucky’s access rules live in 603 KAR 5:120, Access control of highways. Section 4(2) of that regulation puts the application with “the department’s district office for the county in which the requested access point is located.” For Fayette County and its neighbours that office is Kentucky Transportation Cabinet District 7 in Lexington. The procedural detail sits in the Cabinet’s own Permits manual, which is a public document and worth having open before you write an offer.

    The practical test is simple and it is not about city limits. Ask which agency maintains the road your entrance will meet. Nicholasville Road, Richmond Road, Versailles Road and Winchester Road are state routes inside Lexington. An interior subdivision street or a local street is usually not. A parcel can sit entirely inside the urban service boundary, be perfectly zoned, and still have its only usable entrance under state jurisdiction.

    What is in the application package?

    A signed form, a drawing set, a traffic control plan, and — when indemnity is required — a bond. District 7 publishes the list.

    ItemWhat District 7 states
    Application formCompleted and signed Encroachment Permit Application, Form TC 99-1A, submitted electronically as a PDF
    Supplemental documentsDetailed plans, drawings, traffic control plan, submitted as PDFs
    Indemnity, when requiredEncroachment Permit Bond Form TC 99-7, or a cashier’s check payable to the Kentucky State Treasurer; a bond must be accompanied by a notarised power of attorney
    Indemnity amountVaries, and is related to the amount of impact on right of way
    Internal trackingApplications are not logged into the Kentucky Encroachment Permit Tracking (KEPT) system for internal review until all documents are received
    Utility locates near state infrastructureDistrict 7 requires 3 to 5 business days to complete locate requests
    Source: Kentucky Transportation Cabinet District 7 Permits page, read October 3, 2026.

    Read the KEPT sentence twice. The clock a buyer cares about does not start when the engineer emails the form. It starts when the last document lands. An incomplete package is not a slow application; for scheduling purposes it is not an application at all.

    Zoning tells you what you may build. The entrance permit tells you whether anyone can get to it.

    Can the state simply refuse a new entrance?

    On some routes, effectively yes. 603 KAR 5:120 sorts highways into three access categories, and the category decides whether a new access is even on the table.

    Under Section 3 of the regulation, highways are access by permit, fully-controlled, or partially-controlled. On a fully-controlled highway, Section 3(2) states that additional accesses “shall be granted only by constructing new interchanges.” On a partially-controlled highway, Section 3(3)(b) sends new access to the criteria established by KRS 177.315, including minimum spacing. Where access is by permit, the criteria in 603 KAR 5:150 govern approval.

    There is one more clause in that regulation a buyer should price. Section 4(6) requires the applicant to compensate the Department of Highways for any increase in value to the affected property attributable to the new access, and to reimburse administrative expenses. A new curb cut on a state route is a thing of value, and the regulation says so in writing.

    How far apart must entrances be?

    By statute, 1,200 feet in rural areas and 600 feet in urban areas. KRS 177.315(2) sets those minimum spacing figures for partial control of access.

    “Urban” is not a judgement call. 603 KAR 5:120, Section 1(10) defines it as areas of residential, commercial or industrial development of sufficient concentration that they are characteristic of a city and that necessitate, for safety reasons, reduced highway speed limits of forty-five (45) MPH or less, excluding interstate speed limits. Section 1(9) then defines “rural” as all areas other than urban. So the posted speed limit on the frontage is the practical test, and the difference between a 45 MPH frontage and a 55 MPH frontage is the difference between a 600-foot and a 1,200-foot spacing requirement against the next access point.

    Subsection (3) of the statute leaves a door open: the Transportation Cabinet may change the spacing of access control points if the abutting owner or a local government requests it and the change is supported by an engineering and traffic study approved by the state highway engineer. That is a real path, but it is an engineering submission, not a conversation — price it and time it accordingly.

    What happens if an entrance was built without a permit?

    A seven-day removal order and escalating civil fines. KRS 177.106 governs encroachments on a state-maintained right-of-way, and it reaches work a previous owner did.

    The statute defines “encroachment” broadly: any improvement to land including but not limited to buildings, fences, ditches, embankments, driveways or signs, or any change from the original contour of land, that is constructed under, on or over the right-of-way of a state-maintained road and may hinder or prevent use or maintenance of the road. A driveway cut, a culvert, a regraded shoulder and a monument sign all fit.

    Where the Department of Highways determines an unpermitted encroachment interferes with the safe, convenient and continuous use and maintenance of a road, it issues a notice of violation and an order to remove or relocate within seven (7) days, at the responsible party’s expense. If that deadline passes, the department causes the removal itself and recoups the cost from the responsible party.

    The civil fines escalate: five hundred dollars ($500) for a first violation, one thousand dollars ($1,000) for a second within a three-year period, and two thousand dollars ($2,000) for a third or subsequent violation within three years. After a third violation inside three years, the party is barred from receiving an encroachment permit from the department for six (6) months from the date of the third notice — which on a site whose use depends on a new access point is the consequence that matters far more than the money. The statute also makes the responsible party liable, within twenty-four (24) hours of notice, for any safety measures the department deems necessary. Those fines are collected by the municipality in which the violation occurred and used by it for public safety or infrastructure purposes. This version took effect June 29, 2021 by 2021 Ky. Acts ch. 148, sec. 1.

    For a buyer, this converts an existing unpermitted entrance from a cosmetic question into a dated liability with a six-month exposure attached. Ask whether the entrance on the ground matches a permit on file before the offer, not after — and if it does not, a six-month permit bar is a closing-date problem, not a punch-list item.

    What does the permit itself cost the owner?

    More than a filing fee. Under 603 KAR 5:120 the owner may have to compensate the state for the value the new access adds to the property.

    The regulation provides that, prior to issuance of the permit, the owner of the property shall compensate the Department of Highways for any increase in value to the affected property attributable to the new access, based on before-and-after value appraisals by the Department of Highways. The owner also reimburses the department for administrative expenses incurred in processing the permit, the reviews, the hearing and the appraisals, and the cost of construction and maintenance sits with the owner as well.

    There is also a hearing step. Where the State Highway Engineer recommends approval of a permit request on a highway with full or partial access control, the commissioner must provide an opportunity for a public hearing held in accordance with 600 KAR 1:030; after reviewing the results, the Commissioner of Highways makes the final decision. A pro forma underwriting line for “entrance permit” does not cover an appraisal-based payment to the Commonwealth plus a public hearing calendar.

    What should this change about your offer?

    Three things: who you ask, when you ask, and what your contingency actually covers.

    First, the question to ask before the offer is whether the existing entrance is permitted and whether your intended use changes it. An entrance built for a single-family dwelling or a farm is not an entrance built for a commercial user, and a change in use is the trigger for a new application rather than a grandfathered pass. Second, a due-diligence period written around local approvals alone can expire while a state review is still open. Third, a general “subject to permits” clause rarely names the right agency. Naming District 7 and Form TC 99-1A in the contingency is free; discovering them in week six is not.

    It also interacts with the local track rather than replacing it. Access layout feeds the site plan, the site plan feeds Lexington’s final development plan approval, and the parking count that plan has to show is set by Lexington’s commercial parking requirements. Change the entrance and the circulation changes; change the circulation and the parking layout can change with it. Signage has its own separate municipal track, covered in the note on Lexington sign permits for commercial property.

    One observation from reading these files

    My habit on any commercial parcel with frontage on a numbered route is to establish the road’s maintaining agency before I look at anything else in the file, because that one answer tells me which rulebook the deal is actually under. It takes a phone call. The pattern I keep seeing in commercial due diligence generally is not that buyers ignore permits — they research the permits their last deal needed. A right-of-way review is the most commonly missing item in that habit, because residential and in-town infill transactions rarely surface it, and nothing in a title commitment or a zoning letter flags it. The cheapest version of this work happens before the offer, when the answer can still change the price.

    Questions buyers ask

    Does an existing commercial driveway need a new permit when the building changes hands?

    A sale by itself is not the trigger. A change in the type or intensity of use, or any relocation or alteration of the entrance, is what sends you back to the district office. Confirm the specific parcel with District 7 rather than assuming the existing cut transfers with your plans.

    How long does an encroachment permit review take?

    The Cabinet does not publish a single commercial review time, and anyone who quotes you one is guessing. What District 7 does publish is that nothing enters the KEPT review queue until every document is in, and that locate requests near state infrastructure need 3 to 5 business days.

    Who pays to build the entrance?

    The applicant. Beyond construction, 603 KAR 5:120 Section 4(6) requires compensation to the Department of Highways for any increase in property value attributable to the new access, plus reimbursement of administrative expenses. Budget the permit as a cost line, not a formality.

    Last updated: October 27, 2026

    By Marcos Gil, REALTOR® — Keller Williams Commonwealth · KY Real Estate License No. 296259 · Call or text (859) 310-1209.

    This article is general information about a state permitting process, not legal or engineering advice and not a prediction of any permit outcome. Verify current requirements and forms with Kentucky Transportation Cabinet District 7 before relying on them.